Южно-Сахалинск
Responsibilities:
- Design of lower completion installation: 1) Frac&pack 2) Openhole Gravel pack 3) Standalone Screen installation 4) perforated liner)
- Design of upper completion installation: 1) Natural flow 2) Gaslift 3) Smart completion
- Ability to model tubing stress analysis and production packer loads in specialized software (i.e. Wellcat). General understanding of load which tubing and packer experience during various operation phase
- Ability to model Torque and Drag calculations for lower completion, upper completion deployment in specialized software (i.e. WellPlan). General understanding about why it is important to have this modelling performed.
- Experience with writing completion (upper, lower) installation programs
- Experience with writing workover programs
- Understanding of all completion equipment functionality (Xmas Tree, Wellhead, SCSSV, Production packer, Gaslift valves, Downhole gauge, isolation valves, sand control system, sand control filters, seating nipples)
- Understanding material selection for completion equipment
Upon receipt of your request we will contact you to discuss all the details as soon as possible.